Electrical Box: On Monday, Sept. 19th, the new electrical box on the west side of the church was successfully installed. The new panel replaces the eyesore that was there and creates greater efficiency and safety. Please see the related photo to see the final product.
Memorial Boards: A video monitor will be installed in our church narthex that will feature a scrolling list of the names of the donors in our Memorial Society.
Lighting in the Church: We are still working on a bid to replace the light fixtures in the church that currently blink and cease working. We look to install fixtures that better cooperate with LED technology and lightbulbs.